Project Planner
Subsidy Calculator
Calculate commercial polyhouse construction costs, NHB government subsidy eligibility, and net farmer contribution instantly.
Important NHB Rules & Guidelines
- •Estimated NHB subsidy; final approval depends on DPR submission, bank sanction, and joint inspection.
- •Projects below 4,000 sq.m or above 16,000 sq.m are not eligible for NHB subsidy.
- •Total subsidy capped at maximum ₹1 Crore per beneficiary project.
- •First crop established must strictly match approved DPR crop category.
- •Add-on components receive up to 50% subsidy under NHB guidelines.
Need Assistance with DPR or Subsidy Application?
Our protected cultivation experts assist with turn-key erection, DPR bank reports, and end-to-end subsidy paperwork.
Polyhouse Cost Estimator
Interactive Commercial Calculator
500 – 40,000 sq.m
sq.m
50% subsidy applicable
Select first crop above to calculate subsidy. Construction cost shown, subsidy remains ₹0.
Calculated Rate Summary
Estimated Cost Rate (₹ / sq.m)
Total Project₹43,60,000
Structure₹1,090 / m²
Total Rate₹1,090 / m²
Subsidy Rate₹0 / m²
Farmer Net₹1,090 / m²
Structure Construction:₹43,60,000
Crop Establishment:₹0
Estimated Total Subsidy:₹0
Net Farmer Contribution:₹43,60,000